Loading the Page, Please Wait...

Search Our Site

Contact Us:  918-995-2227     Email:  sales@arrowheadprecast.com
Sign Up Now!

ODOT SH-266 and Bird Creek Custom Bridge

This was a custom bridge product that we manufactured for Duit Construction on the SH-266 Bird Creek bridge rehabilitation project. This project required a specialized precast custom bridge component that allowed accelerated bridge construction - reducing the downtime and closure of the state highway. We worked closely with Duit Construction to engineer this project to meet design specifications - meeting or exceeding that of traditional cast-in-place methods. We manufactured these structural components at our manufacturing facility in Broken Arrow, OK and delivered them to the job in the required construction sequence. By utilizing our custom designed bridge components on this project, it allowed the bridge to be constructed in less than 24 hours - with paving completed and the highway reopened for local residents.
Owner: Oklahoma Department of Transportation
Project Engineer: N/A
General Contractor: Duit Construction
Product Installer: Duit Construction
Project Location: Catoosa, Oklahoma

Map Project Location